Seven Elements at Vatika India Next 2, is connected by 3 National Highways – NH 48, NH 248BB and NH 352W. The Gold rated project is a mix of mid-rise and high-rise apartment blocks, with apartments ranging from 1620 to 3680 sq ft. And there are different configurations available in each size. The 14-acre plot is the greenest project surrounded by acres of dense foliage. Seven Elements boasts of 2.5 acres greenery, a grand entry through a tree-lined driveway and a welcoming fountain.
Click here to view Seven Elements sample apartment walkthroughRCC Framed structure, designed in compliance with Seismic Zone IV, adequately fulfilling all earthquake safety requirements. |
Combination of High rise & Mid rise blocks. |
Provision for Residents parking in two level Basements with Elevator access from the Apartment lobbies. |
Floor to floor heights of 3.2 mtrs. provided to ensure very comfortable clear heights and headroom in all apartments |
Intelligent air-conditioning through energy efficient VRV / VRF systems in all bedrooms and living rooms. |
Rainwater harvesting. |
Installation of Sewage treatment plant (STP) |
Recycled water for flushing to each apartment. |
Recycled water for horticulture. |
Spacious elevators with pleasing interiors. Provision of a stretcher lift in all the cores. |
Flooring | High quality, abrasion resistant matt finished vitreous ceramic tiles. |
Wall Finishes |
Premium Emulsion Paint on plastered wall with punning or putty for level and smoothness. |
Flooring | High quality wooden flooring in all bedrooms. |
Wall Finishes |
Premium Emulsion Paint on plastered wall with punning or putty for level and smoothness. |
Flooring | Matt finished ceramic tiles. |
Wall Finishes |
2’ high Ceramic tiles dado above the counter. Premium emulsion on plaster in remaining areas. |
Fitments |
The kitchen shall be fitted with fully furnished Modular cabinets in aesthetically pleasing finishes and matching Granite countertop. A double bowl sink, mixer, a cooktop & a chimney installation will be provided. |
|
Provision for installation of Geyser and water purifiers by the owner. |
|
Provision for supply of Piped Natural Gas / LPG supply to the Kitchen. |
Flooring | Matt finished/anti-skid ceramic tiles. |
Wall Finishes |
Premium Matt finished ceramic wall tiles up to Dado level. Premium Emulsion on plastered surfaces above Dado level. |
Sanitary ware |
Wash Basin and European Water Closet (EWC) of reputed makes and brands. |
C.P. Fittings and Accessories |
Single lever Basin Mixer, Concealed Shower mixer / diverter with bath spout and overhead shower, Health Faucet along with necessary angle valves etc. of reputed makes and brands. |
|
Glass Partition for shower area in toilets.* |
|
All toilet floors provided with suitable and adequate water proofing treatment. |
|
Provision for installation of Geysers and exhaust fans by the owners. |
Main Entrance Door | Polished Hardwood frame with Polished Veneered Doors. |
Internal Doors |
Painted hardwood frames and flush doors. |
Hardware |
Locks, Handles and knobs from reputed makes and brands. High quality steel / brass hardware. |
Windows and External glazing |
Aluminum or Upvc frame windows with clear glass. |
Flooring | Matt finished / Anti Skid ceramic tiles. |
Wall Finishes |
Exterior grade paint on plaster. |
Flooring | Matt finished ceramic tiles. |
Wall Finishes |
Paint on Plaster. |
Flooring | Matt finished ceramic tiles. |
Wall Finishes |
Dado of glazed / matt finished ceramic wall tiles. (Paint on plastered surfaces above dado level for remaining areas). |
Sanitary Ware |
Wash Basin and European Water Closet (EWC) of standard makes. |
C.P. Fittings and Accessories |
Bib cock, Pillar cock, Ablution tap along with necessary angle valves etc. of standard makes and brands. |
External grade Anti Fungal / Anti Algal paint from reputed makes and brands. |
Fixtures and Fittings | IS Compliant Modular switches / sockets, switchgear and distribution boxes from standard makes and brand. |
Wiring |
IS Compliant Copper wiring in concealed conduits. Adequate provision for light points, fan points, receptacles and power points in all rooms. |
IS. Compliant CPVC water supply pipes with standard valves and accessories. |
IS. Compliant PVC waste pipes and traps. |
Adequate power back shall be provided for apartments. |
100% power backup for essential services and common areas such as Lobbies etc shall be provided. |
Gated Complex | Gated community with perimeter wall or fence for security. |
Guard posts on Entrance & Exit with 24hrs. security and CCTV surveillance. |
|
App based visitor management system |
|
Fire and Life Safety Systems |
Advanced fire detection and fire suppression systems in compliance with Fire and life safety codes, including fire detectors, sprinklers and fire hose reels. |
|
Provision of two staircases in each block for evacuation. |
Disclaimer: